Malampuzha Dam kerala tourism
The idea for the dam in Malampuzha region to boost agriculture, began from 10's of the 20th century. But, then, Minister of Public Works, that the pickpocket, was after India's independence in only March 27, 1949. M. Bhaktavatsalam has laid the foundation stone for the project. Palakkad was part of Madras Presidency in these times. Dam in record time, October 9, 1955, after the Madras, has built the Prime Minister, to Sri Lanka. K Kamaraj was launched the dam. Dam, its catchment area, of the front garden, formerly known collectively where they are placed distribution canal is now Ponpaara, Chovankaadu, Iduppady, Vadukampaadam, Thanjikapallam, as Kaarakkaad, was known as Thoopallam "Malampuzha" , Vaarani, Akkarakkaadu, Kadukkaamkunnam, Aanakkuzhykkaadu, Thampuraattypotta, Aanamukkara, Paandipotta, Thekkumpaadam and Koshavanidukku.
Malampuzha Irrigation Project is the first large-scale irrigation system tried in Kerala. This project, a tributary of the Bharathapuzha to irrigate the area of the river Malampuzha, 21245 hectares and consists of a construction dam through a network of canal systems. Dam is a saddle and a mason of straight gravity type of soil. The length of the portion of the masonry part 1,626.71 meters and the soil is 222.20 meters. The capacity of the reservoir is full reservoir level (FRL) + 115.06 in meters and 22 square kilometers 226 mm3 in the water spread area of the maximum height of the masonry dam is 38.10 meters (125 feet). There is a network of 2 canal system to provide the 42,090 hectares of the dam of the reservoir. Canal system, the reservoir providess helps to irrigate farmland while drinking water for Palakkad City and 6 adjacent panchayaths. As if the scarcity of water is too high, the water supply wells in Bharathappuzha be re-filled, during the summer, irrigation station, this way Parali, Mankara, Lakkidi, Ottapalam, Mannanur, Shornur, Ongallur, supply of water to Pattambi the permit, and lift the shutter of the dam, Thrithala etc.
2.5 work of mini power plant of Kerala State Electricity Board of the capacity of MW is in progress since the year.
Dams, irrigation, drinking, industrial, power generation, was conceived as a multi-purpose project to provide water for the transport of fish farming and water. However, plans for water transport was dropped from the initial stage itself, and later began a leisure boat service. Shortly after inauguration of the dam, Palakkad and Malampuzha is now part of the newly formed state of Kerala. Kerala government has started the Malampuzha garden on the front side of the dam. Then, was various other features will be added rock gardens, an aquarium, as the Snake Park and the ropeway.
In 2005, large-scale renovation work began in Malampuzha Gardens as part of the Golden Jubilee celebrations. Re-paint the dam, a huge LED Hoarding was placed on top of the dam. The entire garden is new, it was demolished in order to build a modern garden. At a cost of Rs. 21.57 rupees, was created a new garden has made the best of the tourist destination of Kerala to Malampuzha Garden.
Dams and gardens, weekday evening 6:00 PM on the weekend 8:00 the morning is open from 10 am to PM.